Babel Bike - The Babel is the Safest Bike the World has Ever Seen - iCrowdNewswire
  • Spain
  • Brazil
  • Russia
  • France
  • Germany
  • China
  • Korea
  • Japan
 
x

RSS Newsfeeds

See all RSS Newsfeeds

Global Regions

United Kingdom ( XML Feed )
Global Regions ( XML Feed )

Apr 16, 2015 7:45 AM ET

Babel Bike – The Babel is the Safest Bike the World has Ever Seen

iCrowdNewswire - Apr 16, 2015

Babel Bike

The Babel is the Safest Bike the World has Ever Seen
 
20150311101647-crispinsps
Crispin Sinclair

Babel Electric Motor Model

Electric Motor

Shimano STEPS 250W w/Start mode automatic downshift

Battery

High capacity Shimano Li-ion 36v, 11.6Ah, approx. recharge time 4 hours

Gears

Shimano 11 sp internal gear hub

Gear range

409%

Shifting

Shimano Di2 Electric w/computer display

Crankset

Shimano STEPS lightweight alloy

Chainring

Shimano STEPS steel 44T

Pedals

Composite Platform with reflectors

Brakes

Shimano Hydraulic

Wheel rims/spokes

Alloy 36H, Mavic rim rear/DT Swiss stainless steel

Tyres

Continental Contact 2/e Contact

Safety

ASC Advanced Safety Cell, Foot Protection System

Lighting

Ride on automatic light system

Security Pack

Kryptonite D lock, PinHead © security nuts, SmartWater © marking, entry in company database 

Other

Alloy kickstand, front/rear and wheel reflectors, phone holder and USB charger

Prices and specifications liable to change without notice

Babel Non-Electric Model

Gears

Shimano Alfine 8 sp internal gear hub

Gear range

307%

Shifting

Shimano Alfine 8 sp Rapidfire Plus w/optical gear indicator

Crankset

Shimano Alfine lightweight alloy

Chainring

Shimano Alfine alloy 39T

Pedals

Composite Platform with reflectors

Brakes

Shimano Hydraulic

Wheel rims/spokes

Alloy 36H, Mavic rim rear/DT Swiss stainless steel

Tyres

Continental Contact 2/e Contact

Safety

ASC Advanced Safety Cell, Foot Protection System

Lighting

Ride on automatic light system

Security Pack

Kryptonite D lock, PinHead © security nuts, SmartWater © marking, entry in company database

Other

Alloy kickstand, front/rear and wheel reflectors, phone holder

Prices and specifications liable to change without notice

The Babel Bikes are high quality, high-end bikes built from expensive parts and the price reflects this. Because we are supplying direct to the public, not via distributors and retailers, the price you pay is only covering our costs – not theirs as well. So we firmly believe that we are giving a lot of value to our customers for the price, without the additional mark-ups that traditional distributors and retailers would add.

To secure your Babel Bike you only need to place a deposit now, the remainder will fall due prior to delivery. We will also be offering credit facilities so that the bikes can be bought with 36 monthly payments. The price per-month will be less than taking a bus or car to work (assuming average travel distances), and after three years you will own your Babel Bike outright.

We aim to deliver our Babel Bikes to our first customers in May 2016 and have created a detailed schedule in order for this to occur. Our team are experienced members of the cycle industry and between them have created hundreds of thousands of bicycles before. We have highly experienced manufacturing partners and factories in China and Taiwan lined up already. There is of course much work to do in the year ahead, but we have a first class team and will keep you fully posted on progress over the course of the coming year. The Babel Bike has two international patents pending.

Find This Campaign On
£11,102GBP
raised by 7 people in 1 day
 
22% funded
29 days left
£50,000 GBP goal
Flexible Funding
 

Your contribution

CONTRIBUTE NOW

SELECT A PERK
  • £2,999GBP
    Featured
    ELECTRIC BABEL BIKE

    You receive £500 off the retail price and the Security Pack included, so pay only £2,999 for the electric Babel Bike (normaly £3,499 + £149 for the Security Pack). Best of all, you will receive one of the first 50 Electric bikes made. They will be a limited edition, numbered and signed by the inventor, and you will also receive a 100mm (4″) 3D printed Aluminide model, with your unique bike number also 3D printed on the model. Shipping is £50 UK, £130 EU, £130 US

    Estimated delivery: May 2016

    3 out of 50 claimed

  • £5GBP
    Thank You

    Thank you for supporting our campaign! We will keep you updated with our exciting campaign news and make sure you are first to know when it’s available.

    Estimated delivery: May 2015

    1 claimed

  • £40GBP
    3D Printed Model

    You’ll receive all of the previous perks, plus a fantastic 3D printed model of the Babel Bike – and as with all our perks, you’ll also be kept up to date with how everything is going hear at bicycle-safety HQ (model is 75mm or 3 inches)

    Estimated delivery: May 2015

    0 claimed

  • £100GBP
    Super Early Bird (reservation)

    Now the perks get really interesting! For only £100 deposit you get a £500 discount off the retail price and we’ll also include a Security Pack, Decide nearer the delivery date whether you want the electric Babel Bike for £2,999 (normal price £3,499) or the non-motorised model for only £1,999 (normal prices £2,499). Of course you also get our 3D model. Shipping is £50 (UK), £130 (EU) and £130 (US)

    Estimated delivery: May 2016

    1 out of 100 claimed

  • £1,999GBP
    NON-ELECTRIC BABEL BIKE

    You receive £500 off the retail price and the Security Pack included, so pay only £1,999 for the non-motorised Babel Bike (normally £2,499 + £149 Security Pack). Best of all, you will receive one of the first 50 non-motorised bikes made. They will be a limited edition, numbered and signed by the inventor, and you will also receive a 100mm (4″) 3D printed Aluminide model, with your unique bike number also 3D printed on the model. Shipping is £50 UK, £130 EU, £130 US

    Estimated delivery: May 2016

    1 out of 50 claimed

Do you think this campaign contains prohibited content? Let us know.
 
Contact Information:

Crispin Sinclair
Mark Meadows
Mike Bonney
Graham Jeal

View Related News >